By Nathan Benaich (Air Street Capital) · 2025 report
The infrastructure ambition changed scale in 2025. Stargate proposed $500B of investment and 10GW of capacity over four years. Delivering projects of that size required power supplies, construction, financing, and local support as well as chips.
Stargate’s proposed buildout illustrated the size of the industry’s ambitions. The report also tracked plans for gigawatt-scale clusters and the energy infrastructure needed to support them. Those plans represented future construction, not capacity already serving models. Comparing announcements with delivered power is essential to understanding the buildout.
The market reaction to DeepSeek initially treated a low reported training cost as evidence that demand for chips might shrink. The report argued that cheaper computation could instead make more uses economical. Inference demand was growing as models reasoned for longer and reached more users. Aggregate token counts were still an imperfect comparison because tokens from different models and workloads did not represent identical computation or value.
National ambition met regional limits. The report documented electricity shortfall concerns and opposition to data centers over land, water, noise, and power. Data Center Watch reported $64B in projects blocked or delayed amid local opposition. That is the value of planned projects affected, not a measure of canceled investment or electricity capacity.
A delayed project was not the same as permanently canceled capacity
The $64 billion figure described the value of projects reported blocked or delayed amid local opposition. It did not say that the entire amount was permanently lost or translate directly into electrical capacity. Separating project value, schedule, and delivered power helps make infrastructure claims comparable.
Evidence you can use
The Stargate plan announced in 2025
January 2025 announcement as recorded in the report
All three values describe the announced plan. They are not measurements of investment already spent, chips installed, or operating capacity. Chip count is the report’s approximate translation of the proposed capacity.
An announced US AI infrastructure project targeting $500B of investment and 10GW of capacity over four years, backed by SoftBank, MGX, Oracle, and OpenAI. These were plans, not completed capacity.
The report argued that lower costs could expand the number of economical uses and increase total demand. It presented this as a reason efficiency improvements need not reduce infrastructure demand.
Gigawatt-scale cluster plans made generation, grid connections, and regional electricity availability central to delivery. Buying accelerators alone could not make a cluster operational.
Yes. The report cited Data Center Watch’s $64B estimate for planned projects blocked or delayed amid local opposition. This combined delays and blocks, rather than measuring permanent cancellations.
The report described planned investment over four years. It was an announced future buildout, rather than money already spent or capacity already serving models at publication.
No. The figure concerned proposed US capacity. The report distinguished plans and implied hardware requirements from construction completed and electricity actually available to operating clusters.
Tokens from different models and workloads could require different amounts of computation and deliver different value. Counting them together did not produce a uniform measure of compute or useful work.
No. It covered planned projects reported blocked or delayed. Some could later proceed, and project value did not directly measure lost electricity capacity or permanently canceled spending.
Historical snapshot published October 9, 2025. This web edition was prepared on October 10, 2026 from the online deck and original launch posts. Findings and forecasts retain their original time frame.
2025 report, slide 105 (PDF page 106)Original 2025 report. Slide numbers printed in the deck are one lower than PDF page numbers because the cover is unnumbered.
2025 report, slide 121 (PDF page 122)Original 2025 report. Slide numbers printed in the deck are one lower than PDF page numbers because the cover is unnumbered.
2025 report, slide 128 (PDF page 129)Original 2025 report. Slide numbers printed in the deck are one lower than PDF page numbers because the cover is unnumbered.
2025 report, slide 131 (PDF page 132)Original 2025 report. Slide numbers printed in the deck are one lower than PDF page numbers because the cover is unnumbered.
2025 report, slide 141 (PDF page 142)Original 2025 report. Slide numbers printed in the deck are one lower than PDF page numbers because the cover is unnumbered.
2025 report, slide 146 (PDF page 147)Original 2025 report. Slide numbers printed in the deck are one lower than PDF page numbers because the cover is unnumbered.
2025 report, slide 155 (PDF page 156)Original 2025 report. Slide numbers printed in the deck are one lower than PDF page numbers because the cover is unnumbered.
2025 report, slide 158 (PDF page 159)Original 2025 report. Slide numbers printed in the deck are one lower than PDF page numbers because the cover is unnumbered.
2025 report, slide 202 (PDF page 203)Original 2025 report. Slide numbers printed in the deck are one lower than PDF page numbers because the cover is unnumbered.