What is the difference between B200, GB200, and NVL72?How much announced AI compute is actually operational?How do GPU counts, GPU-hours, and FLOPS differ?What does a chip citation in an AI paper measure?Are the 2026 chip-use figures observed counts or forecasts?How should rented GPUs be counted without double counting?

Questions and answers

Hardware definitions

What is the difference between B200, GB200, and NVL72?

B200 is a Blackwell GPU. A GB200 Grace Blackwell Superchip combines two Blackwell GPUs with one Grace CPU. A GB200 NVL72 rack connects 72 Blackwell GPUs and 36 Grace CPUs.

The index counts GPUs, not racks or CPUs: one GB200 NVL72 rack contributes 72 GPUs. Its B200/B300 and GB200/GB300 charts separate standalone GPU deployments from Grace-Blackwell systems.

Blackwell chart · Grace-Blackwell chart · NVIDIA specifications

Read this answer

Index cutoff · October 1, 2026

How much announced AI compute is actually operational?

Only the “Deployed” segment is classified as operating in this index. “Installing” means hardware is being racked or energized; “Announced” is future capacity. The full length of a stacked bar includes all three.

Read the deployed segment to compare operating GPU counts. An announced delivery date does not establish completion, and deployed hardware does not reveal utilization. The index does not measure an industry-wide conversion rate from announcements to live capacity.

Deployment status chart · Data sources

Read this answer

Compute measurement definitions

How do GPU counts, GPU-hours, and FLOPS differ?

GPU counts describe how many chips there are. GPU-hours combine chip count and time: eight GPUs used for ten hours equal 80 GPU-hours. FLOPS means floating-point operations per second, a computing rate; FLOP counts describe a quantity of work. These measures answer different questions about hardware capacity, time used, and computation. None can be substituted for another without additional assumptions.

An hour on one GPU generation is not necessarily equivalent to an hour on another. FLOPS comparisons must specify numerical precision and whether the number is a theoretical peak, a sparse-workload figure, or achieved performance. Memory limits, communication, software, and workload affect what a system actually delivers. The Compute Index’s cluster charts count GPUs, rather than measuring GPU-hours consumed or achieved FLOPS. Do not infer a performance ranking or training-cost estimate from chip count alone.

NVIDIA H100 performance specifications · What the index counts

Read this answer

Research-paper methodology

What does a chip citation in an AI paper measure?

In this index, a chip citation is a paper’s mention of using a particular chip or chip family. It is an indicator of hardware use in published AI research, not a count of citations that the paper itself receives. The source analysis is supplied by Zeta Alpha. It does not measure how many GPUs a lab owns, how many chip units were sold, or how many GPU-hours the research consumed.

A paper can use more than one chip type, so chip categories can overlap and should not be treated as mutually exclusive shares of all papers. Publication and reporting practices also differ from real-time hardware deployment. The separate research-topic analysis covers 6,356 papers from January 1 to June 1, 2025, uses model-assigned topic labels, and retains chip-topic pairs with at least three papers. Its percentage-point differences describe specialization relative to the sample, not chip speed or market share.

Chip-use chart and notes · Research-topic sample and notes · Zeta Alpha and source methodology

Read this answer

2026 estimates · inputs through September 1

Are the 2026 chip-use figures observed counts or forecasts?

The 2026 citation figures are estimates, not a completed-year census. The chart notes say they combine counts as of September 1, 2026 with predictions for the second half of the year, adjusted for volume. Read the final-year values as projected annual research use. They should not be described as papers already observed across the whole of 2026.

Keep the data periods separate: the chip-citation estimates use September 1 inputs, the fleet inventory has an October 1 cutoff, and the research-topic analysis uses a January-to-June 2025 sample. The published citation notes do not provide a complete reproducible forecasting formula or confidence intervals. That limits how precisely a reader can assess forecast uncertainty or compare a small difference between chips.

2026 citation chart and methodology notes · Source and cutoff notes

Read this answer

Inventory and compute-access methodology

How should rented GPUs be counted without double counting?

Count the physical hardware once in its owner or operator inventory, and describe a customer’s access separately. If a cloud provider operates 10,000 GPUs and rents that same capacity to a lab, adding both figures does not create 20,000 unique GPUs. This is an illustration of overlapping access, not a claim about a particular company. A rental agreement describes a right to use capacity rather than an additional hardware installation.

The index separates selected owner and operator GPU inventories from the frontier-lab compute-access chart. The latter includes commitments and power-capacity figures that cannot simply be added to GPU counts. Individual rows can also describe clusters or broader fleets at different stages of deployment. Do not assume every disclosed figure is mutually exclusive or sum the charts into an audited global total. Check the source, physical site or fleet scope, reporting date, and deployment status before aggregating entries.

Frontier-lab compute access · GPU inventory · Counting rules and deal sources

Read this answer

Charts and sources

  1. Blackwell chart
  2. Grace-Blackwell chart
  3. NVIDIA specifications
  4. Deployment status chart
  5. Data sources
  6. NVIDIA H100 performance specifications
  7. What the index counts
  8. Chip-use chart and notes
  9. Research-topic sample and notes
  10. Zeta Alpha and source methodology
  11. 2026 citation chart and methodology notes
  12. Source and cutoff notes
  13. Frontier-lab compute access
  14. GPU inventory
  15. Counting rules and deal sources

Citation estimates use inputs through September 1, 2026; fleet counts have an October 1, 2026 cutoff. The research-topic sample covers January 1 to June 1, 2025. See each answer for its period and limitations.

All data sources