SpaceXAI’s Colossus 2 has the largest deployed entry, with 550,000 GB200/GB300 GPUs. Its additional 440,000 announced GPUs are excluded from that deployed count.
The count is based on the operator’s reported figures, not an independent hardware audit. The index is a selected inventory; its rows include both individual clusters and combined fleets, and chip counts do not measure usable computing performance.
This index does not establish a complete GPU total for either lab. Anthropic has disclosed access to more than 220,000 NVIDIA GPUs through its Colossus agreement, but access to a partner’s cluster is not ownership or a complete inventory.
A gigawatt measures power capacity and cannot be converted into a reliable chip count without knowing the hardware and facility assumptions. The lab chart mixes existing access, future commitments, “up to” ceilings, and OpenAI’s NVIDIA letter of intent; it is not a measure of capacity operating today.
The index records 23,536 deployed GH200 GPUs in JUPITER’s Booster module at Jülich. The operator specifies 5,884 compute nodes, each with four Grace-Hopper Superchips, matching that count.
This counts the GPUs in the Booster’s standard compute nodes, not every processor or login node in the wider system. A GPU inventory is also different from a supercomputer performance ranking such as TOP500.
A GPU cluster connects GPU-equipped servers so workloads can use multiple machines together. A GPU fleet is an inventory that can span several clusters or locations; it does not necessarily form one interconnected system.
The index includes both individual clusters and aggregate fleet entries, as identified in the row labels and sources. Compare the same scope and deployment status. GPU generation, memory, networking, and workload also affect performance, so twice as many GPUs does not automatically mean twice as much useful compute.
Power requirements depend on the GPUs, server design, networking, storage, cooling, and workload. NVIDIA specifies a maximum system power of 10.2 kW for an eight-GPU DGX H100. As an illustration, 1,000 H100 GPUs in 125 of those systems would have a combined maximum server power of 1.275 MW. That excludes external networking, storage, and facility overhead such as cooling; it is not a measurement of a particular cluster’s electricity use.
Maximum rated power is different from average consumption. Megawatts measure power at a point in time; megawatt-hours measure energy over a period. A system drawing 1 MW continuously for one hour uses 1 MWh. GPU power ratings alone do not describe the whole facility, and an announced gigawatt of future site capacity is not proof of installed chips. This index does not meter electricity use, so its GPU counts cannot establish a global AI power total or a universal conversion between gigawatts and GPUs.
Large AI workloads can split a model or its data across many GPUs. Those GPUs must exchange intermediate results and synchronize their work, so slow communication can leave computing capacity waiting. The network’s bandwidth, latency, and topology therefore affect how efficiently a job uses a cluster. Adding GPUs does not guarantee a proportional increase in useful performance.
NVIDIA distinguishes scale-up communication within a GB200 NVL72 rack, using NVLink, from scale-out connections between racks, using Ethernet or InfiniBand. Storage networking also matters because the GPUs need a steady supply of data. These are different parts of the system, not interchangeable specifications. The index counts hardware; it does not benchmark each cluster’s interconnect, storage throughput, or performance on the same training job. Compare those details before treating two equal-sized GPU clusters as equivalent.
Citation estimates use inputs through September 1, 2026; fleet counts have an October 1, 2026 cutoff. The research-topic sample covers January 1 to June 1, 2025. See each answer for its period and limitations.